We offer a wide range of engineering and field related services. Please explore this section of our website to find out about our services or call us for further details.

Barr Creek

The Barr Creek Hydro Project consists of two 2.25MW Pelton turbines.

Barr Creek is located on western Vancouver Island, approximately 7kms west of the Village of Tahsis. Barr Creek generates at 4.16kV and interconnects to the BC Hydro Distribution system at 25kV.

Prime Engineering’s responsibilities include:

  • Balance of Plant Engineering
  • Controls and Protection Engineering
  • Design and Supply: Switchgear, Main Protection and Control Panel, Intake Control Panel, HPU, Stator Connection and Neutral Grounding Cabinet
  • Supply: 120VDC and 24VDC Systems, Transfer Switch System, Speed and Vibration Monitoring Systems
    Grounding and Powerline Design
  • Testing & Commissioning Services

Key Personal:

Electrical Design and Project Management: Bryson Medlar
Controls Design and PLC Programming: Jena Croft & Craig McFetridge

Prime Engineering builds customized solutions to suit your needs. Please contact us for a cost effective solution.


You are here: Home » Projects » Barr Creek